|
There are currently five contaminated land training modules (CTL1 to CTL5), each of which contain a series of related units (defined under separate headings; CTL1.1, CTL1.2, etc.). When constructing a training programme, we can either deliver one or more modules in their entirety or we can mix and match individual units to tailor the training to your particular needs. AN OVERVIEW TO CONTAMINATED LAND RISK ASSESSMENT CTL1 Introduction to contaminated land risk assessment | | Module Ref. | | Module Content
| | Duration* |
| | CTL 1.1 | | The origins and evolution of contaminated land (CTL) risk assessment in the UK | | 90 mins
| | Technical framework for CTL assessment (guidance and best practice) | | CLR11, R&D66, CIRIA and EA guidance |
| | CTL 1.2 | | Conceptual model development/site characterisation | | 60 mins | | Identifying relevant pollutant linkages |
| | CTL 1.3 | | Preliminary, generic and detailed quantitative risk assessment methods | | 60 mins | | Risk interpretation and determination of sites as contaminated land | | Options appraisals and risk management (remedial works)
|
DATA COLLECTION FOR CONTAMINATED LAND RISK ASSESSMENT CTL2 Geological and hydrogeological principles | | Module Ref. | | Module Content
| | Duration* |
| | CTL 2.1 | | Geological timeframes and the geological record | | 60 mins
| | Geological processes and formations | | Interpretation of geological maps |
| | CTL 2.2 | | Origins of groundwater and the hydrological cycle | | 60 mins | | UK aquifers, non-aquifers, perched and confined conditions | | Groundwater movements; theory and practice | | Solute transport processes; theory and practice | | Springs and rivers |
| | CTL 2.3 | | Hydrogeological measurement and testing | | 30 mins | | | | Flow simulation/modelling | | |
CTL3 Site investigation design and implementation | | Module Ref. | | Module Content
| | Duration* |
| | CTL 3.1 | | Site investigation guidance and best practice (British Standards, Euro Codes, Environment Agency, CIRIA, BDA, NHBC, etc.) | | 90 mins
| | Site investigation design: SI objectives Sampling plans and frequencies Statistical strategies for SI design | | Consultation | | Safety, health and environment |
| | CTL 3.2 | | Site investigation methods: Intrusive techniques (selecting appropriate method) Groundwater and ground gas installations Sampling techniques (soil, groundwater, surface water, ground gas, etc.) Field testing methods Geophysics | | 90 mins | | Laboratory analyses
| | Watch-points for reviewing site investigation reporting/records
| CONTAMINATED LAND RISK ASSESSMENT CTL4 Human Health risk assessment | | Module Ref. | | Module Content
| | Duration* |
| | CTL 4.1 | | Relevant guidance and best practice | | 60 mins
| | Key risk assessment concepts: SPR linkages Toxicology Fate and transport processes Parameterisation |
| | CTL 4.2 | | Quantifying human health risks: soil sources: Availability of screening values (SGVs, GACs, PRGs, EQS, DWS) CLEA methodology (evolution, intension, documentation) Role of CLEA v1.04 (operation, application, limitations) | | 90 mins | | DEMONSTRATION of CLEA v1.04 |
| | CTL 4.3 | | Statistical assessment of site investigation data (CIEH/CL:AIRE guidance)
| | 60 mins | | DEMONSTRATION of Statistics Calculator |
| | CTL 4.4 | | Alternative risk assessment tools (what, when and why)
| | 60 mins | | DEMONSTRATION of various software tools | | Interpretation of modelling results | | Evaluating RA reports (necessities, luxuries and common mistakes)
|
| | CTL 4.5 | | Quantifying human health risks: ground gas sources: CIRIA C665 and BS 8485 assessments Gas migration modelling Data requirements Interpretation of results | | 60 mins |
CTL5 Risk assessment: controlled waters and ecological receptors | | Module Ref. | | Module Content
| | Duration* |
| | CTL 5.1 | | Controlled waters risk assessment: relevant guidance and best practice | | 90 mins
| | Remedial targets methodology (key concepts, terminology, Levels 1 to 4) | | DEMONSTRATION of Remedial Targets Spreadsheet | | Alternative risk assessment tools (what, when and why) | | RAM, ConSim, RBCA Toolkit and RISC | | DEMONSTRATION of various software tools | | Interpretation of results |
| | CTL 5.2 | | Ecological risks assessment: relevant guidance and best practice: Environment Agency’s Ecological Risk Assessment framework Use of Soil Screening Values Alternative screening values and assessment methods Interpretation of results | | 45 mins |
* Approximate duration of each module. Please contact ESI (01743 276100 / email) for more information on groundwater and environmental modular training courses.
|