Contaminated Land Training Modules
There are currently five contaminated land training modules (CTL1 to CTL5), each of which contain a series of related units (defined under separate headings; CTL1.1, CTL1.2, etc.). When constructing a training programme, we can either deliver one or more modules in their entirety or we can mix and match individual units to tailor the training to your particular needs.
|
CTL1 Introduction to contaminated land risk assessment |
||||
| Module Ref. | Module Content | Duration* | ||
| CTL 1.1 |
|
The origins and evolution of contaminated land (CTL) risk assessment in the UK | 90 mins | |
|
|
Technical framework for CTL assessment (guidance and best practice) | |||
|
|
CLR11, R&D66, CIRIA and EA guidance | |||
| CTL 1.2 |
|
Conceptual model development/site characterisation | 60 mins | |
|
|
Identifying relevant pollutant linkages | |||
| CTL 1.3 |
|
Preliminary, generic and detailed quantitative risk assessment methods | 60 mins | |
|
|
Risk interpretation and determination of sites as contaminated land | |||
|
|
Options appraisals and risk management (remedial works) | |||
DATA COLLECTION FOR CONTAMINATED LAND RISK ASSESSMENT
|
CTL2 Geological and hydrogeological principles |
||||
| Module Ref. | Module Content | Duration* | ||
| CTL 2.1 |
|
Geological timeframes and the geological record | 60 mins | |
|
|
Geological processes and formations | |||
|
|
Interpretation of geological maps | |||
| CTL 2.2 |
|
Origins of groundwater and the hydrological cycle | 60 mins | |
|
|
UK aquifers, non-aquifers, perched and confined conditions | |||
|
|
Groundwater movements; theory and practice | |||
|
|
Solute transport processes; theory and practice | |||
|
|
Springs and rivers | |||
| CTL 2.3 |
|
Hydrogeological measurement and testing | 30 mins | |
|
|
Flow simulation/modelling | |||
|
CTL3 Site investigation design and implementation |
||||
| Module Ref. | Module Content | Duration* | ||
| CTL 3.1 |
|
Site investigation guidance and best practice (British Standards, Euro Codes, Environment Agency, CIRIA, BDA, NHBC, etc.) | 90 mins | |
|
|
Site investigation design: SI objectives Sampling plans and frequencies Statistical strategies for SI design |
|||
|
|
Consultation | |||
|
|
Safety, health and environment | |||
| CTL 3.2 |
|
Site investigation methods: Intrusive techniques (selecting appropriate method) Groundwater and ground gas installations Sampling techniques (soil, groundwater, surface water, ground gas, etc.) Field testing methods Geophysics |
90 mins | |
|
|
Laboratory analyses | |||
|
|
Watch-points for reviewing site investigation reporting/records | |||
CONTAMINATED LAND RISK ASSESSMENT
|
CTL4 Human Health risk assessment |
||||
| Module Ref. | Module Content | Duration* | ||
| CTL 4.1 |
|
Relevant guidance and best practice | 60 mins | |
|
|
Key risk assessment concepts: SPR linkages Toxicology Fate and transport processes Parameterisation |
|||
| CTL 4.2 |
|
Quantifying human health risks: soil sources: Availability of screening values (SGVs, GACs, PRGs, EQS, DWS) CLEA methodology (evolution, intension, documentation) Role of CLEA v1.06 (operation, application, limitations) |
90 mins | |
|
|
DEMONSTRATION of CLEA v1.06 | |||
| CTL 4.3 |
|
Statistical assessment of site investigation data (CIEH/CL:AIRE guidance) | 60 mins | |
|
|
DEMONSTRATION of Statistics Calculator | |||
| CTL 4.4 |
|
Alternative risk assessment tools (what, when and why) | 60 mins | |
|
|
DEMONSTRATION of various software tools | |||
|
|
Interpretation of modelling results | |||
|
|
Evaluating RA reports (necessities, luxuries and common mistakes) | |||
| CTL 4.5 |
|
Quantifying human health risks: ground gas sources: CIRIA C665 and BS 8485 assessments Gas migration modelling Data requirements Interpretation of results |
60 mins | |
|
CTL5 Risk assessment: controlled waters and ecological receptors |
||||
| Module Ref. | Module Content | Duration* | ||
| CTL 5.1 |
|
Controlled waters risk assessment: relevant guidance and best practice | 90 mins | |
|
|
Remedial targets methodology (key concepts, terminology, Levels 1 to 4) | |||
|
|
DEMONSTRATION of Remedial Targets Spreadsheet | |||
|
|
Alternative risk assessment tools (what, when and why) | |||
|
|
RAM, ConSim, RBCA Toolkit and RISC | |||
|
|
DEMONSTRATION of various software tools | |||
|
|
Interpretation of results | |||
| CTL 5.2 |
|
Ecological risks assessment: relevant guidance and best practice: Environment Agency’s Ecological Risk Assessment framework Use of Soil Screening Values Alternative screening values and assessment methods Interpretation of results |
45 mins | |
* Approximate duration of each module.
Please contact ESI for more information on groundwater and environmental modular training courses.
